E949 Analysis
2005
Final 2002 pnn1 analysis cuts, PV acc./rej. remeasuring (for verification purposes)
RS
Report at Analysis Meeting at TRIUMF 06/16/2002
RS TDC timing stability studies with pass2 "autorun" ntuples
Some ideas about ultimate time resolution with RS TDCs
Twalk correction for RS TDC
Final RS TDC time offsets for yy.2001-2002 run
ev5 (electron finding)
Report for Analysis Meeting at BNL 02/09/03
Note for June 03 VRVS TD cuts discussion
Note on fitting observed Telec distribution
Outside box study
Status report for Jun 03 VRVS Out-of-box study discussion
George's summary of the meeting above
Status report for Aug 07 video meeting
(more details than for Aug 06 VRVS)
George's summary
Instruction to run outside box script
Other links
Fraction of energy in fera gate function
Videomeeting transparencies
E949 Trigger definition
Morgan's E949 software page
Pass2 useful links
Joe's pass2 ntuple variable description
part 1
and
part 2
Joe's pass2
instruction
Shaomin's
"Ntuple Analysis for Beginners"
Thirsday's
video meetings
Testing area